Background image

Build the Outdoor Kitchen You’ll Actually Use

Custom-designed outdoor cooking spaces crafted for ultimate enjoyment in your backyard.

Call us
FAQs

Outdoor Kitchen Installation FAQs

Answers to your most pressing questions about our custom outdoor cooking spaces.

  • How long does an outdoor kitchen take to build?

    Plan for 1-2 weeks of construction after HOA approval. Complex projects with extensive electrical or plumbing may take longer. We provide a specific timeline during your consultation.

  • Do I need HOA approval?

    In most North Dallas communities, yes. We assist with the approval process, preparing design submissions, material samples, and documentation. City permits we handle completely.

  • What about gas and electrical connections?

    We coordinate all utility work with licensed professionals. Gas lines, electrical circuits, and plumbing are installed to code and inspected as required,

  • What warranty do you offer?

    5-year warranty on all masonry and structural work. Appliances carry their manufacturer warranties, which we help you register.

  • Do you use subcontractors?

    We use our own crews for most projects. For specialized work like gas line installation or electrical, we work with licensed partners we’ve used for years. Either way, you get our process, our oversight, and our warranty.

  • Can you match my existing patio or outdoor space?

    Usually, yes. We design kitchens to integrate with existing patios, pergolas, and landscaping. During consultation, we’ll assess your current setup and recommend the best approach.

Ready to Get Started?

Call (469) 447-5143 for a free consultation. We’ll visit your home, discuss your vision, and provide a detailed quote. No pressure, no obligation.

Call us